Central – Wan Chai Bypass and Island Eastern Corridor Link
Graphic Version   Home Site Map Useful Links Contact Us Privacy Policy Important Notices
  • About CWB • Highlights • Works Progress • Public Engagement • CWB Library • Multimedia Gallery
  Home >About CWB>Project Scope |EN  
  Project Scope
 
Central - Wan Chai Bypass and Island Eastern Corridor Link Overview
Read a text transcript of this video
 
  1. Construction of a 4.5 km long dual 3-lane trunk road with a 3.7 km long tunnel, linking up the Rumsey Street Flyover in Central and the Island Eastern Corridor (IEC) at North Point;
  2. Construction of approach roads to the proposed road tunnel portals in Central, Wan Chai and Causeway Bay. 
    Modification of existing roads in the vicinity of the proposed road tunnel portals in Central and at the IEC at North Point;
  3. Construction of administration building, ventilation buildings, ventilation shafts and buried fresh air adits;
  4. Construction of noise barriers and noise semi-enclosures along IEC, associated road works, reprovisioning works, footpaths, amenity areas, temporary reclamation works, earth retaining structures, drainage works, water works, utilities works, geotechnical works, landscaping works, electrical and mechanical works (E&M) and traffic control and surveillance system (TCSS), etc.

Works Progress
 
 
  2013 © All rights reserved. Highways Department   Last review date: 30 Jul 2019