Central – Wan Chai Bypass and Island Eastern Corridor Link
Graphic Version   Home Site Map Useful Links Contact Us Privacy Policy Important Notices
  • About CWB • Highlights • Works Progress • Public Engagement • CWB Library • Multimedia Gallery
  Home >About CWB>Project Features>Air Purification System (APS) |EN  
  Project Feature
 
 

Air Purification System (APS)

  The ventilation system for CWB tunnel is designed as a semi-transverse system with 3 ventilation buildings, namely West Ventilation Building (WVB), Middle Ventilation Building (MVB) and East Ventilation Building (EVB) and East Vent Shaft (EVS) situated at the Eastern Breakwater of the Causeway Bay Typhoon Shelter. Advanced ventilation system will be installed in the tunnel to improve air quality. In case of fire, the system will contain and discharge the smoke inside the tunnel efficiently to ensure the safety of tunnel users. In addition, latest effective air purification system will be set up to clean the air exhausted from the tunnel to a higher standard.
 
 
  2013 © All rights reserved. Highways Department   Last review date: 21 Oct 2019