Introduction


Contract No. HY/2011/08 - Tunnel Buildings, Systems and Fittings, and works associated with Tunnel Commissioning

    • The works in this package mainly include:

      • Construction of Tunnel Buildings, i.e. West Ventilation Building (WVB), Middle Ventilation Building (MVB), East Ventilation Building (EVB), East Vent Shaft (EVS) and Administration Building (ADB), including structure and building services;

      • Installation of route-wide tunnel E&M works (including fire services installations);

      • Installation of route-wide TCSS works;

      • Construction of tunnel cladding works;

      • Testing and commissioning.

    • The Tunnel Buildings will be installed with Green Roofs and planting in the periphery to promote a greening environment.

    • The Contract is expected to commence in early 2014 for completion in the end 2017.


back to top
UNINTERRUPTED FLOW URBAN GREENING ENVIRONMENTALLY FRIENDLY HARBOUR PROTECTION SPACIOUS VIBRANCY CONNECTION

Share |

You can subscribe to CWB eNews.


CAPTCHA Image Reload Image

   
Graphics represent an artist’s impression of the works
concerned only. They are not drawn to scale and have
been edited and processed with computerized
imaging techniques.

2013 © All rights reserved. Highways Department

Last review date:06 Dec 2018