highways
About Cwb
Highlights
Works Progress
Public Engagement
SITE MAP
TEXT
CWB Library
Other Documents
Other Documents
›
Environmental Related Documents
Environmental Permits
Select the papers here.
Environmental Permit No. EP-364/2009/H
Environmental Permit No. EP-482/2013/C
Environmental Permit No. EP-356/2009
Documents related to Environmental Permits
Select the papers here.
APS Commissioning Test Report - 2nd Stage
Investigation Report on Breakdown of Tunnel Ventilation System at East Ventilation Building
Air Quality Monitoring Plan
APS Commissioning Test Plan
APS Commissioning Test Report - 1st Stage
As built drawings of noise and visual mitigation measures for Slip Road 8
As-built Drawings of Noise and Visual Mitigation Measures
Application No. EIA-141/2007
Application No. EIA-057/2001
›
Gazette Documents
Gazette Documents
Select the papers here.
GN 7506
GN 7222
GN 5375
GN 469
GN 8286
GN 6266
Gazette Plan (Amendment)
Gazette Plan (Original)
GN 3010
GN 4767
GN 8202
›
Miscellaneous
Miscellaneous
Select the papers here.
Paper no. 6/20, Traffic and Transport Committee of Eastern District Council (Only Chinese version available)
Chief Executive’s speech at CWB Commissioning (Only Chinese version available)
Commissioning of CWB to take place on 20 January
Information Paper on Reprovisioning Arrangements of Affected Moorings and Anchorage during Trunk Road Construction at the Causeway Bay Typhoon Shelter
Report on Construction of the Trunk Road Tunnel in Causeway Bay Typhoon Shelter
Share
|