Project Scope

Central - Wan Chai Bypass and Island Eastern Corridor Link Overview

  1. Construction of a 4.5 km long dual 3-lane trunk road with a 3.7 km long tunnel, linking up the Rumsey Street Flyover in Central and the Island Eastern Corridor (IEC) at North Point;
  2. Construction of approach roads to the proposed road tunnel portals in Central, Wan Chai and Causeway Bay.
    Modification of existing roads in the vicinity of the proposed road tunnel portals in Central and at the IEC at North Point;
  3. Construction of administration building, ventilation buildings, ventilation shafts and buried fresh air adits;
  4. Construction of noise barriers and noise semi-enclosures along IEC, associated road works, reprovisioning works, footpaths, amenity areas, temporary reclamation works, earth retaining structures, drainage works, water works, utilities works, geotechnical works, landscaping works, electrical and mechanical works (E&M) and traffic control and surveillance system (TCSS), etc.
Works Progress

back to top

Share |

You can subscribe to CWB eNews.


CAPTCHA Image Reload Image

   
Graphics represent an artist’s impression of the works
concerned only. They are not drawn to scale and have
been edited and processed with computerized
imaging techniques.

2013 © All rights reserved. Highways Department

Last review date:06 Dec 2018